Take a look: Façade installation under way at U Centre office building in Bucharest
A new video has been released to show façade installation under way at the Chapman Taylor-designed U Centre, a new, eight-floor office development in the Romanian capital, Bucharest.
Despite the restrictions which had been imposed due to the COVID-19 pandemic, construction work is proceeding to schedule. All of the interior materials have now been selected, while Chapman Taylor has carried out site inspections within two weeks of the country’s borders reopening.
U Centre under construction in Bucharest - July 2020
Located in the city’s Sector 4 at Calea Serban Voda, the 45,000m² GBA building provides Class A workspace across eight above-ground floors, with retail space at the ground floor and two basement levels for parking and services. A pleasant, landscaped courtyard welcomes visitors and occupants to the spacious reception lobby at ground floor level.
The façade design makes use of natural stone and aluminium composites to give an urban downtown feel, with wide upper-level terraces and a roof garden creating attractive spaces in which the building’s users can relax and interact.
U Centre is located close to the city’s Tineretului and Carol parks, making it perfectly placed for pleasant lunchtime strolls and post-work socialising. A metro station 100 metres away from the building provides easy access to the rest of the city.
The development has been designed to the highest levels of sustainability specification and has achieved LEED Platinum certification.
Chapman Taylor acted as Lead Architect on this attractive office scheme, supporting the local architect in applying for Building Permission and the client, Forte Partners, during the tendering process.